A.G.
Consulting provided Construction Management
services which included civil, mechanical,
electrical, plumbing, sprinkler, standpipe,
fire protection, fire detection and fire alarm
system for the Glenmont Estate at Edison NHS.
The scope of the work included the installation
of a new vertical borehole type geothermal
heat exchanger, water-to-water type geothermal
heat pumps, new modular air handling units
with both chilled and hot water coils. Also
installed was new electrical service, new
electrical panels, new indoor/roadway lighting,
power distribution, fire alarm system, security
system and telecommunication system, new automatic
fire detection and dry pipe sprinkler system.
The architectural/civil components included
removal, salvage and storage of historical
items, excavation, exterior ground repairs,
masonry repairs, rough and finish carpentry,
repair of various architectural finishes including
lath, plaster, ceramic tile and decorative
painted finishes. |