A.G. Consulting, as a member of a multi-discipline consultant team, is preparing and developing engineering design documents for the Fulton Street Transit Center (FSTC). The FSTC complex will link NYC Transit facilities with PATH service and provide for a new underground corridor that will be extended in the future into the redeveloped World Trade Center site and points west.

AG has developed the design concepts, including the performance of studies, and prepared the Preliminary Engineering documents (plans, specifications and schedules designated as Phase I). AG will also perform the Final Design (Phase II) and Construction Support Services (Phase III). AG is a sub-consultant to ARUP and is responsible for the MEP portion of the project.
Roosevelt Ave. Station Rehabilitation
Fulton Street Transit Center
Bleecker Street Historical Station Rehabilitation, Lexington Avenue, Number 6 Line
JFK Airport General Aviation Terminal Building New Addition
Arch St. Shop & Yard
Goethals Bridge Renovation
Rail/
Transportation
Educational
Historical
Courts/ Prison
Residential/ Commercial
Green Building
Additional Facilities