A.G.
Consulting, as a member of a multi-discipline
consultant team, is preparing and developing
engineering design documents for the Fulton
Street Transit Center (FSTC). The FSTC complex
will link NYC Transit facilities with PATH
service and provide for a new underground
corridor that will be extended in the future
into the redeveloped World Trade Center site
and points west.
AG has developed the design concepts, including
the performance of studies, and prepared the
Preliminary Engineering documents (plans,
specifications and schedules designated as
Phase I). AG will also perform the Final Design
(Phase II) and Construction Support Services
(Phase III). AG is a sub-consultant to ARUP
and is responsible for the MEP portion of
the project. |