A.G. Consulting's Principal performed electrical
design services for 4 new accesses to GCT.
Two were located on 45th Street and two on
47th/48th Streets. In addition, there were
two cross passage ways (one below 45th Street
and the other below 47th Street) between upper
and lower tracks. 14 new elevators and three
new escalators were also included in the design.
The electrical work included outdoor/indoor
lighting, power, telephone system, public
address, fire alarm, security, data and signal
systems. The whole length of the platform
J (East Spine) and Platform O (West Spine)
were provided with new lighting, outlets and
low voltage systems. The power was derived
from three 5kV/480volt substations.
Station
Master’s Office Renovation
Renovation of the existing Station Master’s
Office/Control Room to provide new lighting,
power, telecommunication, public address,
visual information, fire alarm, signaling,
and security systems. Tying the new systems
into the existing systems without disrupting
operation was challenging. This required
coordination with the operating personnel
& thorough knowledge of the existing
facilities.
|
|
|
|
|
|
|
|
|
|
|