A.G. Consulting provided mechanical, electrical, plumbing design and construction phase services. These services included: electrical distribution and power control, lighting, mechanical, plumbing, sprinkler and fire protection systems including, outdoor security lighting and communication systems.

This 92,000 sq. ft new school was a modular construction. All the walls and plumbing/electrical rough-ins were manufactured in Pottstown, PA and were brought by trucks in Manhattan. The work was inspected by AG's engineers at the factory before allowing dispatches. The project was completed in a record time.