Construction Management
Amtrak CM Services for NJHSRIP Metuchen Frequency Converter Project
MTA Bus CM Services for Eastchester Bus Depot
MTA Bus CM Services for La Guardia Bus Depot
NYCT CM Services for 53rd Street Tube and Rockaway Park Yard
NYCT CM Services for Montague Rehabilitation Project
NYCT CM Services for South Ferry Rehabilitation
NYCT CM Services RecoveryResiliency Projects Manhattan, Queens & Brooklyn CM-1535
NYCT CM Services Traction Power & Quality Management Dyckman Street Substation
NYCT CM Services Traction Power 3000KVA Sub-Station Replacement
TBTA CM & Inspection Services for BB-45
TBTA CM Services for new 5kV Electrical Switchgear Substation at Verrazano Narrows Bridge
Design
LIRR Design for Replacement of Long Beach Traction Power Substation, NY
LIRR Design-Build Services for the Arch Street Yard and Shop
LIRR East Side Access Project GEC Services
LIRR Morris Park Locomotive Repair & Overhaul Shop
MNR Harmon Shop Replacement Program – Phase V
MNR Harmon Shop Replacement Program-Phase III Locomotive Wash Facility
MNR Poughkeepsie Station and Parking Lot Improvements—Engineering Design
MTA Baisley Park Bus Depot Renovations & Upgrade
MTA LI Bus Disaster Recovery & Training Room Facility Rockville Center Depot
MTA LI Bus Security Access Control Card System
NJT Hilton Garage General Office Building Parking Deck Reconstruction
NJT New Garfield Station (Design to Link Old Garfield Depot and Plauderville Depot, NJ)
NJT Super Bowl 48 Temporary Emergency Power System
NYCT 68th Street-Lexington Avenue Line Installation of ADA Elevators
NYCT 68th Street-Lexington Avenue Line Mod14
NYCT Bowling Green Subway Station
NYCT CM1287 ESS & CCTV Various Stations
NYCT CM1410 ESS at Wall Street Complex
NYCT Drafting Services for CM-1411
NYCT Enhanced Station Initiative Program Facilitator Project
NYCT Feasibility Study for ADA Accessibility for 59 Street
NYCT Feasibility Study for ADA Accessibility for Bedford Park Blvd
NYCT Feasibility Study for ADA Accessibility for Eastern Parkway
NYCT Flood Mitigation-Resiliency Design for 14 Critical Fan Plants
NYCT Flood Mitigation-Resiliency Design for 148th & 207th Street Yards and Portals
NYCT Greenpoint Tunnel As-Built Drawings
NYCT New Fulton Street Transit Center Station Complex
NYCT New Stair P-10 at the Grand Central 42nd Street Station
NYCT Roosevelt Avenue-74th St. Subway Station Renovation and New Bus Depot
NYCT Second Avenue Subway Project
NYCT St. George Terminal Interlocking
NYCT West End Line 12 Station Rehabilitation
PANYNJ Duct Bank Replacement in PATH Tunnels A&B under the River Section
PANYNJ Electrical Design for Additional CCTV Security Cameras at Stair R Port Authority Bus Terminal
TBTA AW-98 Feasibility Study at Queens Midtown Tunnel and Brooklyn Battery Tunnel
TBTA Brooklyn Battery Tunnel Project BB-15A
TBTA Design Services for Marine Parkway Mechanical-Electrical Flood Mitigation
TBTA Design Services for the Addition of an Emergency Generator on Governors Island
TBTA Electronic Security and Design Support Services Project 26 for Throgs Neck Bridge
NJT Penn Station NY Central Concourse Redev
LIRR Design for Replacement of Long Beach Traction Power Substation
LIRR Penn Station Critical Improvements
MNR Harmon Shop Phase III Locomotive Wash Facility
MNR Harmon Shop Replacement Program – Phase V Stage I
MNR Harmon Shop Replacement Program – Phase V Stage II
MNR New Haven Line Substation Commissioning
MTA Baisley Park Bus Depot Renovations
MTA Enhanced Station Initiative
MTA LIRR East Side Access Architecture
MTA LIRR East Side Access Project General Engineering Consultant Services
NJT Super Bowl 48 Temporary Emergency Power System
NYCT 14th Street ADA Complex DB
NYCT 68th Street Lexington Ave Line Mod 14
NYCT 69th Street Lexington Line ADA Elevators
NYCT Dyckman Street Substation Commissioning
NYCT Flood Mitigation Resiliency Design at 148th and 207th
NYCT Flood Resiliency for Joralemon Tube
NYCT Fulton Street Station Complex
NYCT IDIQ AE Design Services As Builts Greenpoint Tunnel
PANYNJ PABT Design Competition